• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Oct 2025 - Oct 2025
  • Estimated project cost $200,000
  • Australian Government contribution $200,000
  • Local Council/Shire Shire of Merredin
  • State WA

Project description

Drainage culverts failing due to salt ingress.

Remove and replace Culverts. The 5 section culvert will be replaced with 5 x 600 mm HDPE pipes, 5 pipes with 3 pipes in a triple precast 600 headwall and 2 pipes in a double 600 precast headwall. The 2 section culvert will be replaced with 2 x 900 mm HDPE pipes, 2 pipes with both pipes in a double 900 precast headwall. Total pipe schedule: 600mm pipes – 10 lengths of 6 metres long each 900mm pipes – 4 lengths of 6 metres long each

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.