• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Sep 2025 - Oct 2025
  • Estimated project cost $941,198
  • Australian Government contribution $941,198
  • Local Council/Shire Penrith City Council
  • State NSW

Project description

Brigelly Road is a Minor Collector road which, according to Council records, was constructed circa1975. The road has experienced numerous failures with rutting, crocodile cracking and patches and has been repaired via heavy patching. Due to the age of the road and the increasing traffic volume it is suggested that the existing base materials need to be replaced with full depth asphalt and to privide a 50mm AC14 wearing surface.

It is proposed to replace the base material to the trafficable lane with the asphalt and provide a 50mm asphalt wearing surface. Below is a list of the works proposed to 760m length of road by 13m wide: 50mm AC14 wearing surface 100mm AC20 base Not Compliant.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.