• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Feb 2026 - Mar 2026
  • Estimated project cost $626,054
  • Australian Government contribution $626,054
  • Local Council/Shire Swan Hill Rural City Council,City of Swan
  • State WA

Project description

This section of Truganina Road scored a surface condition rating of 2.68 out of 5 (with 5 being very poor) in the 2020 condition survey. Recent visual inspections note that road has deteriorated since the condition survey noting extensive patching and cracking along the extents due to heavy vehicle traffic in industrial area and multiple maintenance work requests. Rehabilitation is required to rectify.

In situ foamed bitumen stabilisation to a depth of 270 mm, profile off top 40 mm material, apply 7 mm granite primer seal, and lay 40 mm new asphalt concrete wearing.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.