• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Oct 2025 - Nov 2025
  • Estimated project cost $251,746
  • Australian Government contribution $251,746
  • Local Council/Shire Swan Hill Rural City Council,City of Swan
  • State WA

Project description

This section of Thorburn Avenue scored an average surface condition rating of 2.94 out of 5 (with 5 being very poor) in the 2020 condition survey. Recent visual inspections note that there cracking and tree root uplift along this section of road. Resurfacing is required to rectify.

Straight Line Kilometre (SLK) 0.31-0.33 measured from Thorburn Avenue: Profile off 70 mm asphalt wearing, apply two coat emulsion primer seal, lay two layers (40 mm+30 mm) new Asphalt wearing to address tree root issue. The entire section apart from the above: Profile off 40 mm asphalt wearing, apply two coat emulsion primer seal, lay 40 mm new Asphalt wearing.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.