• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Feb 2025 - Mar 2026
  • Estimated project cost $136,000
  • Australian Government contribution $136,000
  • State SA

Project description

Failed base and seal due to inadequate storm water management.

Survey the vertical and horizontal alignment of existing sealed roadway, cut out and remove the existing base material. Correct both the horizontal and vertical alignments and design heights. Reconstruction of Kerb and Water table infrastructure to improve storm water management. Cart in place and compact road sub-base material, cart in place base layer and compact base layers, perform a two coat bitumen 14/7 seal inclusive of prime coat.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.