• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Oct 2025 - Apr 2026
  • Estimated project cost $152,775
  • Australian Government contribution $152,775
  • Local Council/Shire Shire of Strathbogie
  • State VIC

Project description

The road pavement has deteriorated, with surface material depth degraded to a point of failure and general roughness beyond maintenance grading.

The entire section of road pavement will be re-surfaced in 250mm gravel / crushed rock, to be compacted to 100mm, graded and reformed as per Councils maintenance protocol.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.