• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2025 - Nov 2025
  • Estimated project cost $65,000
  • Australian Government contribution $65,000
  • Local Council/Shire Shire of Wyalkatchem
  • State WA

Project description

The road pavement has deteriorated due to insufficient gravel thickness, leading to excessive corrugations, pothole formation, and loose surface material. These issues have been exacerbated by ongoing traffic wear and weather exposure, compromising road safety, increasing maintenance demands, and reducing overall usability.

Re-sheet existing formation with gravel overlay. The re-sheeting works aim to rectify surface deterioration caused by traffic and weather, specifically targeting potholes, corrugations, and loose gravel. These issues compromise road safety, reduce driving comfort, and increase maintenance costs. Re-sheeting restores the structural integrity and usability of the road.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.