• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2025 - Nov 2025
  • Estimated project cost $50,000
  • Australian Government contribution $50,000
  • Local Council/Shire Shire of Wyalkatchem
  • State WA

Project description

The inlet of the six-cell culvert has collapsed due to structural failure, likely caused by heavy water flow, erosion, and inadequate drainage capacity. Additionally, undermining has been observed near the culvert edges, indicating a risk of progressive deterioration and potential long-term damage if remedial action is not taken. Immediate intervention is required to restore structural integrity and prevent further failure.

Replace the failed six-cell culvert and restore safe, reliable drainage infrastructure, reducing the risk of flooding, erosion, and road damage.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.