• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Jan 2026 - May 2026
  • Estimated project cost $750,000
  • Australian Government contribution $200,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing road has a narrow seal that is old and deteriorating.

Where sections of the road show pavement failure, box out and replace with new gravel. Undertake shoulder widening and form a sealed surface at least 6.0metres wide by sealing the existing shoulder area where necessary. Complete a sprayed reseal on the full width of the road, place guide posts as required, mark and spray centre and barrier lines. Additional funding provided by: Regional Road Group $500,000 Shire of Manjimup $ 50,000

Total cost of proposed project is $750,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.