• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Nov 2025 - May 2026
  • Estimated project cost $750,000
  • Australian Government contribution $200,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing road is unsealed and the horizontal alignment is sub-standard.

Remove trees detailed in the engineering design and replace culverts as required; where the new alignment differs from the existing alignment, prepare the sub-grade to the design alignment and levels. Import, spread and compact new gravel for the entire width and length of the project length forming an 8 metre wide pavement then place a 6 metre wide, 2 coat spray seal. Place centre and barrier line marking and guide posts as required. Additional funding provided by: Regional Road Group $500,000 Shire of Manjimup $ 50,000

Total cost of proposed project is $750,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.