• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Nov 2025 - Apr 2026
  • Estimated project cost $86,000
  • Australian Government contribution $51,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

Subgrade failures exist that result in an uneven running surface, potholes and crocodile cracking plus the existing seal is old an generally in poor condition.

Box out the road where subgrade failures are located and import and fill the excavations with gravel; if necessary install subsurface drainage coil to encourage ground water to run away from the road to the verge. Place a spray sealed primer on these sections then an asphalt overlay along the road. Additional funds provided by: Shire of Manjimup $35,000

Total cost of proposed project is $86,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.