• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Nov 2025 - Mar 2026
  • Estimated project cost $224,547
  • Australian Government contribution $121,948
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

The existing road surface is affected by various defects, especially by severe cracking and pavement deformations. It is old and rough due to numerous surface defects. Some kerb and gutter sections have been damaged.

Proposed treatment includes repair of isolated sections of kerb and gutter, replacement of road base with asphalt and resurfacing of the road with asphalt. Length =165 m; Width = 7.8 m Area = 1287 m2.

Total cost of proposed project is $224,547

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.