• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Apr 2025 - Jun 2027
  • Estimated project cost $650,000
  • Australian Government contribution $650,000
  • Local Council/Shire Junee Shire Council
  • State NSW

Project description

This location has significant pavement failure due to water ingress. Rain events result in 50 mm - 100 mm of water to remain on the pavement for an extended period and have resulted in deterioration of the asset.

Reconstruction and drainage including the installation of twin stormwater lines each side of the road down Regent Street. Pavement rehabilitation including replacement of the base and subbase layers. Installation of a two coat seal, 10/7 mm and replacement of any kerb and gutter in poor condition.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.