• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Apr 2026 - Jun 2026
  • Estimated project cost $1,100,000
  • Australian Government contribution $1,100,000
  • Local Council/Shire Walcha Council
  • State NSW

Project description

There is currently spasmodic Kerb & Gutter along Croudace St and this project will complete the K&G along the entire street on both sides. The project all also address drainage issues, with stormwater infrastructure being installed at each relevant street intersection. Street widening will also occur in areas in ensure parallel edges of Croudace Street.

Project will tie into existing Kerb and Gutter, installing absent K&G, along Croudace St Walcha. Street will be widened as needed to ensure consistent width. Project also includes Stormwater Infrastructure on intersecting streets.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.