• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Dec 2025 - Jun 2026
  • Estimated project cost $1,196,000
  • Australian Government contribution $560,000
  • Local Council/Shire Shire of Plantagenet
  • State WA

Project description

The Hay River crossing bridge in in very poor condition with extensive degradation of the concrete throughout the 4 box section barrels. The road receives large volumes of heavy traffic and the replacement is considered to be urgent.

Removal and replacement of the existing culvert structure with similarly sized pipes. Reinstatement of the road pavement to new design levels. Installation of a Main Roads WA compliant safety barrier. Relocation and reinstatement of services, site clearing and dewatering within the scope of works. The project is Joint funded with Main Roads WA (WA Government funds).

Total cost of proposed project is $1,196,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.