• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Apr 2026 - May 2026
  • Estimated project cost $190,000
  • Australian Government contribution $40,000
  • Local Council/Shire Shire of Harvey
  • State WA

Project description

Pavement deterioration, localised flooding, damaged kerbing.

Upgraded stormwater system to eliminate localised flooding. Repair damaged pavement and provide adequate foundation. Repair damaged kerbing and replace as per Australian Standard. Local residence access to property is hindered.

Total cost of proposed project is $190,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.