• Funding program Roads to Recovery Program
  • Status Not started
  • Transport mode Road
  • Expected start/finish Feb 2026 - Jun 2026
  • Estimated project cost $540,000
  • Australian Government contribution $43,205
  • State WA

Project description

Insufficient pavement strength, poor drainage, safety risks due to narrow carriageways and limited shoulders increase crash risks, and inadequate capacity for heavy vehicles. Reconstruction of existing road from Type 4 to Type 6. Pruning vegetation. Recondition & widen shoulder from 8 m to 10 m. Basecourse layer, wet mix and 2% cement stabilisation, balance, compact & trim. Installation of Primer seal – 8000 m2. Installation of two coats hot seal C170, using 14/10 aggregate – 8000 m2. Extend existing drainage culvert & install precast headwalls at SLK 2.42 Install guideposts & signage.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.