• Funding program Roads to Recovery Program
  • Status Not started
  • Transport mode Road
  • Expected start/finish Feb 2026 - Feb 2026
  • Estimated project cost $239,255
  • Australian Government contribution $239,255
  • State VIC

Project description

Asphalt Roadway Renewal. Defects include wide ranging cracking (longitudinal, transverse), numerous patches and depressions including the roadway, rutting along wheel paths at approach to intersections and fatigue appearance and pavement failing in sections. Profile: 50 mm (full width) and Resurface: Wearing Course - full width with 50 mm size 10 mm aggregate Hot Mix Asphalt (HMA) Type V & Type H including Green coloured surface treatment within the bicycle lane on both sides. City of Melbourne Project Reference WKO1190832.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.