• Funding program Roads to Recovery Program
  • Status Not started
  • Transport mode Road
  • Expected start/finish Jan 2027 - Feb 2027
  • Estimated project cost $456,684
  • Australian Government contribution $456,684
  • State NSW

Project description

Peppermint Crescent is Local road which, according to Council records, was constructed circa198. The road has experienced numerous failures with rutting, crocodile cracking and patches and has been repaired via heavy patching. Due to the age of the road and the increasing traffic volume it is suggested that the existing base materials and the subgrade need to be stabilised with additional impoted DGB20 and to privide a 50mm AC14 wearing surface. Below is a list of the works proposed to 190m length of road by 12m wide: 300mm Stabilisation with 50mm AC14 wearing surface.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.