Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Major Projects Business Case Fund
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Successful Projects under the Active Transport Fund - Tranche 1
      • Bridges Renewal Program
      • Safer Local Roads and Infrastructure Program
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 2
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 3
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 4
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
    • 2024-25 MYEFO
    • 2026-27 Budget announcements
    • Budget 2024-25 announcements
    • Infrastructure Investment Program Strategic Review
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads and Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2026 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
Allowed types: txt pdf jpg doc docx ppt pptx xls and xlsx.
The accumulated size of all files in this form cannot exceed 10 MB.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Mount Amos Road, (Rural Road) - 138960-26QLD-RTR
Localised scouring and washout problem at Approx. CH 1.4 along Mount Amos Road from the Mulligan Highway. Project will install of reinforced concrete drainage structures and a concrete causeway. The crossing is the subject of frequent resident complaints, especially during the wet season due to the poor and dangerous condition of the the crossing.
Loading Street, Perenjori - 139016-26WA-RTR
Surface Renewal to asphalt due to frequent water inundation and heavy vehicle traffic, improve access to school carpark due to soft shoulder at entrance.
Bunjil North East Rd, rural road - 139015-26WA-RTR
Reform, resheet reinstate drainage to improve water shedding ability of road on school bus route.
Settlement Rd, Perenjori - 139014-26WA-RTR
Reform and resheet and install additional drainage. to improve safety for school bus route, currently immpassable in heavy rain events
Taylor Rd, Latham - 139017-26WA-RTR
Reform, resheet reinstate drainage to improve water shedding properties of surface and improve skid resistance during wet weather events. Strengthen road structure.
Blackwood Ave, augusta - 139019-26WA-RTR
Remediation of old drainage infrastructure, regrading of intersection and reconstruction of footpaths.
Bussell Hwy, Cowaramup - 139018-26WA-RTR
Reconfiguration of the Peak St and Waverly Rd intersections with Bussell Hwy to improve intersection capacity and safety. Works are connected to the Birdwood subdivision and will include developer contributions.
Hillview Rd, augusta - 139020-26WA-RTR
Mix of reconstruction and shape correction with AC7 skim coat with reseal in the following year.
Tunbridge St, margaret river - 139013-26WA-RTR
Replacement of drainage pipes that are dredging and causing pavement failure. Reinstatement of private drainage connections, pavement, footpath and kerb.
River Road, Hattah - 138723-26VIC-RTR
Gravel road has reached “end of useful life” and is breaking. Gravel re-sheet in accordance with Asset Maintenance Strategy.

Pagination

  • « First
  • ‹ Previous
  • 4436
  • 4437
  • 4438
  • 4439
  • 4440
  • 4441
  • 4442
  • 4443
  • 4444
  • Next ›
  • Last »

There are no matches for your search