Skip to main content
  • Contact (Opens in a new tab/window)
Logo image Logo image
  • Home
  • About
    • National Initiatives
      • Roads of Strategic Importance
      • Major Projects Business Case Fund
      • Remote Roads Upgrade Pilot Program
      • Corridor Packages
    • Local Initiatives
      • Roads to Recovery Program
      • Black Spots Program
      • Heavy Vehicle Safety and Productivity Program
      • Local Roads and Community Infrastructure Program
      • Active Transport Fund
        • Australian Capital Territory Active Transport Fund Projects
        • New South Wales Active Transport Fund Projects
        • Northern Territory Active Transport Fund Projects
        • Queensland Active Transport Fund Projects
        • South Australia Active Transport Fund Projects
        • Tasmania Active Transport Fund Projects
        • Victoria Active Transport Fund Projects
        • Western Australia Active Transport Fund Projects
      • Bridges Renewal Program
      • Safer Local Roads and Infrastructure Program
        • Safer Local Roads and Infrastructure Program: NSW Successful Projects
        • Safer Local Roads and Infrastructure Program: NT Successful Projects
        • Safer Local Roads and Infrastructure Program: Queensland Successful Projects
        • Safer Local Roads and Infrastructure Program: SA Successful Projects
        • Safer Local Roads and Infrastructure Program: Tasmania Successful Projects
        • Safer Local Roads and Infrastructure Program: Victoria Successful Projects
        • Safer Local Roads and Infrastructure Program: WA Successful Projects
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 1
        • Successful Projects under the Safer Local Roads and Infrastructure Program - Tranche 2
        • Table: Funded projects – Heavy Vehicle Rest Area Tranche 3
        • Table: Funded projects – Safer Local Roads and Infrastructure Program (SLRIP)
    • Budget Announcements
      • Infrastructure Investment Program Strategic Review
    • 2024-25 MYEFO
  • Projects
    • Bruce Highway
    • Projects near me (Opens in a new tab/window)
    • Melbourne to Brisbane Inland Rail
    • Moorebank Intermodal Terminal Precinct
    • Northern Australia Roads Program and Northern Australia Beef Roads Program
    • Outback Way
    • Sydney Metro—Western Sydney Airport
    • Western Sydney Infrastructure Plan
  • Resources for funding recipients
    • Federation Funding Agreement Schedule
      • Project templates
    • The National Land Transport Network
    • Indigenous Employment and Supplier-use Infrastructure Framework
    • Innovative funding and financing
    • Cost Estimation Guidance
    • Safer Local Roads and Infrastructure Program - Resources
    • Local Roads and Community Infrastructure Program resources
    • Roads to Recovery Program resources
    • Nominating a Black Spot
      • Site eligibility
      • Black Spots Program - Frequently Asked Questions
    • Active Transport Fund - Resources
    • Signage Guidelines
  • Contact (Opens in a new tab/window)
Search
  • Home
  • About
  • Projects
  • Resources for funding recipients

Infrastructure Investment Program

The Australian Government is committed to a 10-year, over $120 billion infrastructure investment pipeline, ensuring a rolling program of sustainable land transport infrastructure projects.

The Government is working in partnership with states and territories to deliver a credible and sustainable pipeline of projects which support a range of economic and social objectives, including productivity and resilience, sustainability and liveability.

Search for a place or project
Projects near me

Links

  • IMS (Opens in a new tab/window)
  • RPM Portal (Opens in a new tab/window)
  • Department (Opens in a new tab/window)
  • Ministers (Opens in a new tab/window)
  • australia.gov.au (Opens in a new tab/window)

Utilities

  • Feedback (Opens in a new tab/window)
  • Contact us (Opens in a new tab/window)
  • Disclaimer (Opens in a new tab/window)
  • Privacy (Opens in a new tab/window)

We acknowledge the traditional owners of the Country throughout Australia and their continuing connection to land, sea and community. We pay our respect to them and their cultures and to the Elders past and present.

©2022 Commonwealth of Australia

Return focus to the top of the page

Submissions or registrations of interest to be kept informed about the progress of this work, can be made directly via email to costestimation@infrastructure.gov.au or by using the form below.

Items marked with (required) are mandatory fields.

Maximum 3 files.
10 MB limit.
Allowed types: txt, pdf, jpg, doc, docx, ppt, pptx, xls, and, xlsx.
10 MB limit per form.

Australian Privacy Principle 5 Notice

Your submission, including any personal information supplied, is being collected by the department for the purpose of seeking public and industry comment on the approach and content of its proposed cost estimation guidance, in accordance with the Privacy Act 1988 (the Privacy Act).

Your personal information will be stored securely by the department. It may be used by the department to make further contact with you about the consultation process. Your personal information will not be disclosed to any other third parties, except in the circumstances outlined below.

Submissions, in part or full, including the name of the author may be published on the department's website or in the Government's response, unless the submission is confidential. Confidential submissions (including author name) will not be published. Private addresses and contact details will not be published or disclosed to any third parties unless required by law.

Submissions will only be treated as confidential if they are expressly stated to be confidential. Automatically generated confidentiality statements or disclaimers appended to an email do not suffice for this purpose. If you wish you make a confidential submission, you should indicate this by ensuring your submission is marked confidential.

Confidential submissions will be kept securely and will only be disclosed in the following circumstances:

  • in response to a request by a Commonwealth Minister;
  • where required by a House or a Committee of the Parliament of the Commonwealth of Australia; or where required by law.

The department may also disclose confidential submissions within the Commonwealth of Australia, including with other Commonwealth agencies, where necessary in the public interest.

Please note that in order to protect the personal privacy of individuals in accordance with the Privacy Act any submissions containing sensitive information, personal information or information which may reasonably be used to identify a person or group of people may not be published, even if not marked as confidential.

The department's privacy policy contains information regarding complaint handling processes and how to access and/or seek correction of personal information held by the department. The Privacy Officer can be contacted on (02) 6274 6495.

Nottinghill Road, Lidcombe - 065991-16NSW-RTR
Significant damage to the asphalt pavement surface including surface cracking, localised pavement failure and presence of loose stones from asphalt delamination due to increased traffic in the area.Remove existing pavement surface, repair failed sections and provide a new asphalt surface.
Cumberland Road - 065992-16NSW-RTR
Significant damage to asphalt surface, surface deformation and localised pavement failure.Removal of existing asphalt surface, repair of failed pavement section and provide a new asphalt surface.
Pearce Street, Nathalia - 065994-16VIC-RTR
Pearce Street has pavement failures, poor kerb and channel, and inadequate drainage.Reconstruct kerb and channel, and road pavement including drainage repairs.
Moulamein Road - Barham - 066000-16NSW-RTR
The shoulders are failing due to inadequate shoulder material. Road is also a dust nuisance, slippery when wet and water ponds and pools on the shoulsers.Rehabilitate 800m of the pavement and widen and seal the shoulders. Drainage works are proposed to capture stormwater runoff. The pavement will be suitable for B Double and Road Train movements. This also a school bus route.
Murray Road, Settlement - 066002-16WA-RTR
Road has been damaged by heavy turning traffic such as, road trains and semi trailers accessing the Christmas Island Phosphates stockpile area, which causing serious potholing. Additionally, part of the road is unsealed causing dust nuisance to nearby residents.It is proposed to reconstruct and seal to a two course sealed road.
Station Road, Auburn - 066016-16NSW-RTR
Significant surface damage and significant pavement deformation resulting from increased traffic and development activities.Full pavement reconstruction, replacement of damaged concrete kerb and gutter where required and provision of a new asphalt surface.
Voss Road - 066017-16QLD-RTR
Voss Road is an important agricultural collector road in the Elliott area. The road is 5 kilometres long and is bitumen sealed except for this last connection to the Isis Highway. The sealing of this section will improve safety for motorists using the road and reduce maintenance costs for Council.Earthworks, pavement construction, and bitumen sealing for two traffic lanes.
Birrel Street, Mount Hawthorn - 066018-16WA-RTR
Deteriorated road asphalt surface and substandard kerbing sectionsReseal deteriorated road surface with a 30mm stone mastic asphalt overlay and replace substandard kerbing where required to prolong the life of the asset and improve its level of service
Milton Street, Mount Hawthorn - 066019-16WA-RTR
Deteriorated road asphalt surface and substandard kerbing sectionsReseal deteriorated road surface with a 30mm stone mastic asphalt overlay and replace substandard kerbing where required to prolong the life of the asset and improve its level of service
Pier Street, Perth - 066021-16WA-RTR
Deteriorated road asphalt surface and substandard kerbing sectionsReseal deteriorated road surface with a 30mm stone mastic asphalt overlay and replace substandard kerbing where required to prolong the life of the asset and improve its level of serviceTotal cost of proposed project is $75,693

Pagination

  • « First
  • ‹ Previous
  • 489
  • 490
  • 491
  • 492
  • 493
  • 494
  • 495
  • 496
  • 497
  • Next ›
  • Last »

There are no matches for your search