StateProponentProject NameProject SummaryAustralian Government Funding ($)Total Project Cost ($)
NSWMoree Plains Shire CouncilMoree Plains Shire Council - Design and Construct Terry Hie Hie Road Upgrade, Terry Hie HieThe project is for the design and construction of the upgrade to the Terry Hie Hie Road at Terry Hie Hie. The project will upgrade and bitumen seal 4.9km of Terry Hie Hie Road (SR101) North from the Gwydir/Moree Plains Shire boundary. The works will provide an 8m wide sealed surface, improved pavement and drainage improvements to address nuisance flooding.$5,000,000$6,250,000
NSWBogan Shire CouncilBogan Shire Council - Remove and replace the existing informal low-level crossing with Box Culvert at Monkey Bridge Bypass at Bogan River, CoolabahThe project is for the construction of a formal bypass at Monkey Bridge on the Bogan River in Coolabah, replacing the 40 year old existing informal and illegally maintained crossing. The new bypass will utilise box culverts to facilitate proper water flow and fish passage. The structure will span 14.4 metres with 6m width and 10-metre sealed approaches on both sides.$412,000$515,000
NSWWentworth Shire CouncilWentworth Shire Council - Design and upgrade of Milpara Road, Anabranch South.The project is for the design and upgrade of Milpara Road, Anabranch South. The project will include formation widening to achieve minimum 6m width, guard rail extension, upgrade of unsealed road to sealed pavement including two intersection upgrades. Additionally, it will include a dual-bound hardstand area for decoupling/turn-around point for heavy vehicles, embankment protection for the extent of the waterway, sight distance improvements as well as traffic control devices/other road furniture.$559,417$765,721
NSWGoulburn Mulwaree CouncilGoulburn Mulwaree Council - Glynmar Road Causeway Design and Upgrade Project

The project will replace a failing causeway across Stony Creek which is rapidly approaching the end of its asset life.
The replacement bridge, of concrete culvert design, will:

  • raise the height
  • increase the width (to 9.0m)
  • improve the vertical road alignment for the site
  • install road shoulders
  • install guard rails
  • undertake line marking.
$1,219,092$1,523,865
NSWGwydir Shire CouncilGwydir Shire Council - The Design and Construction to upgrade Buckie Road, Croppa Creek.The project is an upgrade to a 10.03km section of the Buckie road - from an unsealed to sealed state - at Croppa Creek within the Gwydir Shire, up to the border of Moree Plains Shire Council. Upgrade works include road sealing, flood immunity, strengthening and widening, pavement rehabilitation and road alignments. Existing pavement will be re-shaped to a 9m formation and stabilised to a depth of 400mm, a 200mm base layer of DGB20 road base will be laid under an 8m wide two-coat bitumen.$5,000,000$6,855,000
NSWLismore City CouncilLismore City Council -Chelmsford Bridge, Chelmsford Road - Bridge RenewalThe project will replace the current Chelmsford Bridge structure with a single span, single lane, concrete and steel structure. The length of the new bridge will be 20m and the finished surface level of the deck will be raised approximately 2.0m in height from the existing bridge deck. The new bridge will have a design life of 100 years.$1,676,000$2,095,000
NSWWaverley CouncilWaverley Council - Construction of Continuous Footpath Treatments on Mitchell Street, Bondi BeachThe project involves constructing two continuous footpath treatments along Mitchell Street, at the Hastings Parade and Ramsgate Avenue intersections. The works will include kerb buildouts with garden beds and street trees to compliment the new continuous footpath treatments.$121,750$243,500
NSWLismore City CouncilLismore City Council - The Channon Road, Dunoon - UpgradeThe project will upgrade Channon Road from Currie Road to Dunoon Road. Approximately 1.9km of road will be upgraded to at least 7m width formation with sealed shoulders. Camber and superelevation issues to be improved along the road. Drainage issues to be factored into the road upgrade together with pavement rehabilitation.$2,015,708$2,519,636
NSWMid-Coast CouncilMidCoast Council - Replacement of Mt. Coxcomb Rd Bridge Number 1, Upper LansdowneThe project will replace the Mt Coxcomb Road Bridge Number 1 which has reached its end of life. The bridge is a single-span, single-lane timber bridge over Lansdowne River on Mt Coxcomb Road. Flood waters have damaged the timber structural elements of the bridge. The new bridge will be raised above 1/100 flood levels and upgraded to meet current bridge standards. The project involves removal of the existing structure and construction of a single-lane concrete bridge over Lansdowne River. The replacement bridge is proposed for the same location with upgraded length of 15m and width of 5m.$1,433,225$1,791,532
NSWWaverley CouncilWaverley Council - Construction of Raised Pedestrian Crossing on Newland Street at Walter Street, Bondi JunctionThe project is for the construction of a raised pedestrian crossing on Newland Street at Walter Street, Bondi Junction. The project involves the removal of existing pedestrian refuge islands and replacement with a new raised pedestrian crossing. The works include kerb build-outs with landscaping, raingardens, street trees, upgrades to street lighting and new kerb ramps to compliment the new raised pedestrian crossing.$96,250$192,500
NSWWaverley CouncilWaverley Council - Construction of Bourke Street Upgrades, Bondi JunctionThe project involves upgrades to Bourke Street from Queens Park Road to Birrell Street, including a new separated uphill one-way bike path northbound, various intersection improvements including new continuous footpath treatment, kerb extensions reducing pedestrian crossing widths, landscaping, street trees, and other upgrades.$444,299$888,598
NSWMaitland City CouncilMaitland City Council - Thornton North Road Infrastructure Lane Duplication of Haussman Drive Thornton between Raymond Terrace Road and Taylor AvenueThe project is for lane duplication of approx. 400m of Haussman Drive between Raymond Terrace Road and Taylor Avenue to provide dual carriageways in each direction with central median island shared path shoulder/bicycle lanes and improved adjacent property accesses including dedicated left in out intersection for an approved senior's development.$3,745,400$7,490,800
NSWGoulburn Mulwaree CouncilGoulburn Mulwaree Council - Lansdowne Street Heavy Vehicle Route Pavement Rehabilitation Project

The Lansdowne Street Heavy Vehicle Route Pavement Rehabilitation Project will remediate and upgrade a 530m section of road where significant pavement failure has occurred. The structural improvements delivered by this project include:

  • a full depth asphalt pavement layer across the existing traffic lanes (2 x 3.5m lanes) to a thickness of 230mm
    • Asphalt 20 for pavement stabilisation sub layer (180mm thickness) (AR450)HD
    • topped with a wearing layer of Asphalt 14 (50mm thickness) (AR450)HD
  • repaving the stopping & parking lanes to a thickness of 250mm
    • Asphalt 20 for pavement stabilisation sub layer (200mm thickness) (AR450)HD
    • topped with a wearing layer of Asphalt 14 (50mm thickness) (AR450)HD
  • new line marking
  • kerb & guttering repair.
$1,909,687$2,387,109
NSWCouncil of the City of ShellharbourCouncil of the City of Shellharbour - Yellow Rock Road Safety Upgrades, TullimbarThe project involves the construction and upgrade of more than 600m of Yellow Rock Road in Tulimbar. The project includes widening the road, installing new kerbing and guttering, re-grading the surface, adding car parking spaces, and upgrading intersections and access points. Also, it includes the construction of a pedestrian refuge and shared path, improvements to lighting and stormwater infrastructure, and the installation of new signage and line markings.$5,000,000$10,905,370
NTCentral Desert Regional Council
  1. Central Desert Regional Council - Upgrade of Willowra main access road.
The project will upgrade various sections of Willowra main access road from 111.45km to 128.03km by lifting up the subgrade and gravel sheeting.  The total length of the proposed sections is approximately 14.18km with an average width of 7m.   $1,918,669    $2,398,337
QLDMareeba Shire CouncilMareeba Shire Council - Design and construct of Leadingham Creek Road and upgrade culvert at Sandy Creek, Dimbulah.The project will widen Leadingham Creek Road from chainage 8.04 to chainage 11.48 to a consistent 2 lane, 7m wide roadway with 0.5m shoulders on either side of the roadway (excluding the single culvert at Twelve Mile Creek). This project will also replace the minor culvert at Sandy Creek. In total the project will upgrade 3.27km of the road network.$4,474,392$5,592,990
QLDQueensland Department of Transport and Main RoadsQueensland Department of Transport and Main Roads. - Kennedy Highway (Cairns - Mareeba), Koah, construct Heavy Vehicle Rest Area.The project is for the design and construction of a new combined decoupling site and heavy vehicle rest area on the Kennedy Highway (Cairns – Mareeba) near Koah. The site will include four B-double bays with all-weather seal, shade (natural/shelter), tables and chairs, lighting and rubbish bins, allowing vehicles to travel approximately 26km further prior to decoupling.$5,000,000$10,000,000
QLDMoreton Bay Regional CouncilMoreton Bay Regional Council - Caboolture River Road Safety Upgrades, Upper Caboolture.The project will realign the road geometry and improve the cross-section to improve the safety of the section of Caboolture River Road between Gregor Road and Phelps Road. This will meet the desired standards of service for a rural sub-arterial road.$2,995,123$6,046,242
QLDMoreton Bay Regional CouncilMoreton Bay Regional Council - O'Mara Road Upgrade, Narangba.The project will upgrade O’Mara Road over its complete length between Oakey Flat Road and Stone Ridge Boulevard, so that it meets the desired standard of service for a district collector road. The scope of works includes road widening, pavement rehabilitation, street lighting, kerb and channel upgrades, improved active transport provision, and an upgrade to the intersection with Oakey Flat Road.$1,702,604$3,451,845     
SAMount Barker District CouncilMount Barker District Council - Springs Road East.The project will widen Springs Road between Bald Hills Road and Heysen Boulevard. Additionally, the bridge will also be widened with upgraded safety barriers to accommodate the wider road and cyclist infrastructure. This road project will upgrade 1 km of the road network.    $5,000,000  $11,008,449
VICSwan Hill Rural City CouncilSwan Hill Rural City Council - Karinie Street Reconstruction Project.The project will upgrade a section of Karinie Street starting from chainage 0+000 to 0+570 with total length of 570m. The project will include drainage system improvement, road construction with 40-year pavement design life, kerb and channel replacement, all-abilities shared-path, road line-marking including parking delineation, and improved lighting (where required).    $4,992,000    $6,240,000
VICGreater Shepparton City CouncilGreater Shepparton City Council - Design and Construction to upgrade Goulburn Valley Highway (Numurkah Road) and Hawkins Street intersection, Shepparton.

The project will upgrade the Goulburn Valley Highway (Numurkah Road) and Hawkins Street intersection. The project includes:

  • Signalisation of the intersection
  • A short right-turn lane and a shared through/left lane from Hawkins Street
  • A left-turn deceleration lane into Hawkins Street from the north
  • Widening to facilitate northbound cycling intersection traffic
  • Consolidation of service roads and site accesses to the west
  • Pedestrian crossings on all but the northern leg to improve safety and traffic efficiency.
$5,000,000    $6,380,520
VICSouth Gippsland Shire CouncilSouth Gippsland Shire Council - Design & Construction Of The Simons Lane And Bass Highway Intersection Realignment Leongatha South.The project will relocate the Simons Lane intersection with the Bass Highway (B460) to a safer new location approximately 300m north east along the Bass Highway from the current location.  The relocated intersection will incorporate dedicated turn lanes, road pavement improvements and lighting.$2,400,000    $3,000,000
VICYarriambiack Shire CouncilYarriambiack Shire Council - Banyena Pimpinio Road.The project is for the widening of Banyena Pimpinio Road, which is a strategic freight route. The road will be widened from a narrow-sealed road (3.7m) to a 6.6m wide sealed surface with 2m wide shoulders both sides.$878,080    $1,254,400
VICYarriambiack Shire CouncilYarriambiack Shire Council - Glenorchy Road.The project is for the widening of Glenorchy Road which is a strategic freight route. The road will be widened from a narrow-sealed road (3.7m) to a 6.6m wide sealed surface with 2m wide shoulders both sides.$490,000      $700,000
WACity of AlbanyCity of Albany - Chillinup Road SLK 31.22- SLK 38.5 Sealing Project.The project will seal Chillinup Road SLK 31.22 - SLK 38.5 to alleviate traffic congestion and improve efficiency. The project will seal, widen and improve drainage on 7.28 km of Chillinup Road in Gnowellen.    $2,378,169    $2,972,712
WATown of Victoria ParkTown of Victoria Park - State Street and Albany Highway intersection improvement.

The project is for improvements to the State Street and Albany Highway intersection, including:

  • Approximately 40m length/700sqm of raised intersection (plateau)
  • Formalised pedestrian zebra crossing points on the plateau
  • On-street parking modification
  • Tightened kerb radii
  • WSUD/Urban Greening - Tree Planting/Rain Gardens/Permeable Paving
  • Lighting and signage modifications.
$27,4425       $56,8850
WACity of SwanCity of Swan - Construction of Safe Active Street (SAS) on Helena Street, Guildford.The project is for the construction of Safe Active Street on Helena Street, Guildford. The project will include traffic speed reduction along Helena Street corridor from 50 km/h to 30 km/h. Six raised safety platforms and/or intersection narrowing treatments are to be installed along Helena Street. Approximately 1km of the road carriageway will be narrowed to a final width of 4.8m. Carriageway narrowing treatments include but are not limited to on-street parking delineated by building tree nibs or landscape buildouts.$881,485    $1,762,970
WAShire of KondininShire of Kondinin - Sealing and Upgrade of 17km section of Hyden-Norseman Road, Hyden.The project will upgrade a 17km gravel section of the Hyden-Norsman Road with a 7.4m width two coat bitumen seal and associated delineation, drainage and shoulder work.$4,000,000$,500,0000