| State | Applicant | Project Name | Project Description | Australian Government Funding Amount | Total Project Cost |
|---|---|---|---|---|---|
| ACT | City and Environment Directorate | Transport Canberra and City Services Directorate - Sutton Road Bridge Upgrades | Upgrade of six bridges along Sutton Road (a B-double approved route that provide access to ACT and NSW freight hubs) from T44 rating (approximately 50 tonnes) to SM1600-HML (68 tonnes) loading. | $1,245,000 | $2,490,000 |
| NSW | Balranald Shire Council | Balranald Shire Council - Sealing Benanee Road, Euston | The project will upgrade approximately 15 km of Benanee Road, a local unsealed road used by school buses and local traffic. Works will include the construction of subbase and base layers, application of a bitumen seal, and installation of edge line marking across the entire length. | $4,944,000 | $6,180,000 |
| NSW | Bega Valley Shire Council | Bega Valley Shire Council - Seven Mile Creek Armco Culvert Upgrade | Upgrade existing twin-cell Armco culvert to single span bridge | $3,545,990 | $4,432,488 |
| NSW | Bellingen Shire Council | Bellingen Shire Council - Design and Replacement of Summervilles Creek Bridge and Summervilles Bridge plus 3km Road Sealing - Thora/Gleniffer | The project will replace two timber bridges with reinforced concrete structures. Additionally, 3km of the existing 6m wide unsealed road will be rehabilitated and sealed with bitumen. | $3,822,818 | $4,922,818 |
| NSW | Canterbury-Bankstown Council | Canterbury-Bankstown Council - Design and Upgrade of First Avenue Bridge BRI00260. | The project involves the replacement of the existing First Avenue Bridge, a single-span cast in-situ concrete elliptical arch structure with a clear span of 3.6 metres and a total cell length of 20.71 metres. | $1,559,000 | $3,118,512 |
| NSW | Canterbury-Bankstown Council | Canterbury-Bankstown Council - Design and Upgrade of Second Avenue Bridge BRI00275 | The Second Avenue Bridge Upgrade project involves the full replacement of the existing deteriorated bridge structure in Campsie with a new single-span bridge measuring 3.6 metres in width and 17.6 metres in length. | $2,492,827 | $4,985,655 |
| NSW | Cessnock City Council | Cessnock City Council - Ferguson Street Bridge Replacement Project | The project will replace the existing timber Ferguson Street Bridge with a new dual-lane concrete structure built to modern standards. The new bridge will be 22.66 meters in length and 11.45 meters in width, with an open load limit. Works will also include reconstruction of approximately 35.69 meters of approach road to tie into the new structure. The design will incorporate a shared pathway across the bridge, providing safe and reliable access for both vehicles and pedestrians. | $1,004,715 | $2,009,430 |
| NSW | City of Newcastle | City of Newcastle - Design and Replacement of Hunter Street bridge over Cottage Creek, Newcastle West | The project will replace the Hunter Street bridge over Cottage Creek, in Newcastle West. Through collaboration with Hunter Water Corporation (HWC), the full sub-structure and superstructure will be replaced. Being in an urban environment, multiple services that currently pass through, or under the bridge deck, will be relocated fully beneath the bridge via underboring. | $5,000,000 | $21,000,000 |
| NSW | Goulburn Mulwaree Council | Goulburn Mulwaree Council - Design and Upgrade of Sandy Point Road Bridge Project | The project will replace a failing culvert/causeway across a tributary of Budjong Creek which is rapidly approaching the end of its asset life. The replacement bridge, of concrete culvert design with a link slab, will provide increased water flow through capacity to improve flood immunity, increase carriageway width (to 9.0m) and include road shoulders, guard rails, line marking and a fish ramp to facilitate the passage of native fish through the waterway. | $1,228,207 | $1,535,259 |
| NSW | Kyogle Council | Kyogle Council - Upgrade 5.1km across 5 sections of the Clarence Way between Bonalbo and Urbenville | The project aims to upgrade 5.1km of the Clarence Way across 5 locations. The upgrades will involve widening the pavement to a consistent 7.6m wide bitumen sprayed seal, pavement strengthening, ride quality improvement, improving drainage, replacement of culverts, line marking, signage and delineation. | $4,998,703 | $6,248,703 |
| NSW | Lismore City Council | Lismore City Council - Tweed St / Dunoon Rd Corridor Upgrade | The project will upgrade a total road length of approximately 1.7km with widening of travel lanes to 3.5m wide and with sealed shoulders. Additionally, three intersections will be upgraded with the installation of roundabouts. The main road and also the cross-road will both be upgraded to provide for a Flood Evacuation Route. | $4,857,156 | $6,071,445 |
| NSW | Lockhart Shire Council | Lockhart Shire Council - Henty-Pheasant Hills Road Widening | The project will widen Henty-Pheasant Hills Road Widening, approximately 1300 metres of the road will be widened to a consistent 9-metre formation width, including a 200mm gravel overlay to pavement strength. | $1,040,000 | $1,300,000 |
| NSW | Nambucca Valley Council | Nambucca Valley Council - Saul's Dairy Culvert Replacement, Utungun | The Saul's Dairy culvert replacement project consists of the replacement of 2 by 32m long 3.6m diameter steel culverts with a new 5.4m x 5.4m reinforced concrete box culvert and retaining wall. | $2,415,019 | $3,018,774 |
| NSW | The Council of Camden | The Council of Camden - Turner Road and Dunn Road Roundabout | The project will upgrade the unsignalised, signage-controlled Turner Road–Dunn Road intersection to a single-lane roundabout with raised pedestrian crossings on the Turner Road and Central Hills Drive approaches. Works also include pavement reconstruction, line marking, signage, lighting, and construction of retaining walls at the north-east corner to stabilise the embankment and enable a shared pedestrian path on the northern side of Turner Road. | $979,574 | $1,959,148 |
| NSW | Waverley Council | Waverley Council - Construction of Raised Pedestrian Crossings on Murriverie Road, North Bondi (Boondi) | The project will construct a new raised safety platform at the entirety of the Murriverie Road and Hardy Street intersection with two new pedestrian crossings. The works will include the removal of the existing pedestrian refuge islands and kerb ramps and the installation of new kerb build-outs and street trees. Additionally, rain gardens will be constructed to improve stormwater management. Road markings will be renewed. | $484,325 | $968,650 |
| NSW | Wollondilly Shire Council | Wollondilly Shire Council - Design and upgrade of Hawthorne and Johnston Roads, Bargo | This project will install missing links of kerb, gutter and footpath, widen the road and stabilise, and install new pits. | $3,086,723 | $3,858,404 |
| NSW | Wollondilly Shire Council | Wollondilly Shire Council - Design and upgrade of Radnor Road, Bargo | This project will install missing links of kerb, gutter and footpath, widen the road and stabilise, and install new pits. | $2,511,244 | $3,139,055 |
| NT | Litchfield Council | Litchfield Council - Thorngate Road - Pavement Rehabilitation | This project will upgrade a section of Thorngate Road realigning a section of the road which is curved for a distance of 400m. The scope includes road widening, installation of safety guardrails and regulatory speed reduction to address road safety issues that exist with the current arrangement. | $1,280,000 | $1,600,000 |
| QLD | Carpentaria Shire Council | Carpentaria Shire Council - Leichhardt River Crossing Bridge Replacement | This project will remove the existing single lane bridge and replace it with a newer modular wider two-lane bridge with the height of the crossing raised. The modular bridge will be raised higher with 1200 x 450 culverts placed on both sides of the approaches with concrete slab on top. | $4,999,692 | $6,599,578 |
| QLD | Flinders Shire Council | Flinders Shire Council - Reconstruction of Mowbray Street (Swanson St to Resolution St), Hughenden, QLD | The project aims to widen the 400m long road to provide improved access to adjacent residential properties, provide additional parking and enhancing stormwater runoff management. The existing kerb and channel will be replaced, adjacent open drains will be regraded and stormwater structures may also be installed to improve stormwater flow. The road will have a consistent sealed width of approximately 12.6m for traffic lanes and parking. Additionally, the project will upgrade three intersections with new kerbing to improve geometry and stormwater runoff. | $1,461,957 | $1,827,447 |
| QLD | Flinders Shire Council | Flinders Shire Council - Upgrade to Chisolm Street and Christison Street, Prairie | Road upgrade from the end of bitumen on Chisolm Street to blocks past Christison Street and upgrade Christison Street to end of boundary. Works to include drainage solution for drain that runs through Christison Street, water main, earthworks, bitumen sealing. The extent of the proposed sealed road is approximately 400m in length and 12.6m in width. | $2,234,080 | $2,792,600 |
| QLD | Flinders Shire Council | Flinders Shire Council - Upgrade to Corney Street and Franzmann Road, Hughenden | Road upgrade from Richmond Hill Drive to the Franzmann Road boundary. Works to include cul-de-sac, kerb and channel, earthworks, full width bitumen seal. The extent of the proposed sealed road is approximately 600m in length and 12.6m in width. | $2,640,960 | $3,301,200 |
| QLD | Gold Coast City Council | Gold Coast City Council - Upgrade of Pimpama Jacobs Well Road/Wharf Road/Old Wharf Road intersection | This project is to signalise the intersection of Pimpama Jacobs Well Road/Wharf Road/Old Wharf Road, Pimpama. The project scope includes construction of additional turn lanes, signal hardware, kerb and channel, signage and linemarking, stormwater drainage and lighting. | $3,913,996 | $7,828,989 |
| QLD | Hinchinbrook Shire Council | Hinchinbrook Shire Council - Macknade Creek Bridge Replacement, Design and Construction - Macknade | Replace existing failing timber bridge with concrete structure. | $792,000 | $990,000 |
| QLD | Queensland Department of Transport and Main Roads. | Queensland Department of Transport and Main Roads - Roma – Condamine Road: Pavement strengthening and widening – Stage 1 | Design and construction of pavement strengthening and widening for Roma-Condamine Road from Lynns Creek Road to the east to a consistent minimal width of 8.0m and marginally wider to allow for curve widening where required. | $4,999,896 | $9,999,792 |
| QLD | Scenic Rim Regional Council | Scenic Rim Regional Council - Design and Upgrade of Taylor Bridge, Lamington | The project will replace the existing timber bridge with a new concrete bridge with increased flood immunity. The new bridge and approximately 700m of Christmas Creek Road will be realigned to provide safe road geometry. | $5,000,000 | $6,459,000 |
| QLD | Southern Downs Regional Council | Southern Downs Regional Council - Design and Construction of Cox Bridge on Victoria Street, Warwick | The project will replace the existing dual lane pipe culvert crossing known as Cox Bridge on Victoria Street, Warwick with a dual lane multi-span bridge with a load limit of 160T. The project will include approaches to the bridge. | $3,528,210 | $4,410,263 |
| QLD | Toowoomba Regional Council | Toowoomba Regional Council - Design and Upgrade of Bowenville Moola Road and Myall Creek Bridge | This project will widen the Myall Creek Bridge and approaches on Bowenville Moola Road to two lanes to improve safety. | $3,650,000 | $4,590,594 |
| QLD | Toowoomba Regional Council | Toowoomba Regional Council - Design and Upgrade of Oakey Biddeston Road - Stage 3 | Widening and strengthening narrow sealed road for improved heavy vehicle access | $4,300,000 | $5,387,305 |
| SA | Alexandrina Council | Alexandrina Council - Upgrade of Breawood Road Bridge, Sandergrove | The project will involve removing the existing bridge on Breawood Road, Sandergrove and installing a new 3m wide box culvert crossing. The unsealed road will also be widened to 7m at the crossing with new guardrails to allow for increased Heavy Vehicle use. | $367,104 | $458,880 |
| SA | The Corporation of the City of Adelaide | City of Adelaide - Design and Construction - School Safety - Addressing Priority Issues | The project will provide intersection upgrades to 7 intersections near 6 schools within the City of Adelaide. | $435,000 | $870,000 |
| TAS | Circular Head Council | Circular Head Council - Design and Construct Woolnorth Road Bridge over Welcome River | Replacement of existing bridge structure to provide a dual lane concrete 6.8m wide x 19.8m long concrete bridge structure, including W beam bridge rail and terminals | $696,744 | $870,930 |
| VIC | Campaspe Shire Council | Campaspe Shire Council - Davis Road from Murray Valley Highway to Patho Station Road | Design & construct project to upgrade 3.2 kilometres of Davis Road, Patho from an unsealed gravel road to an all weather, sealed road. | $2,520,528 | $3,150,660 |
| VIC | Campaspe Shire Council | Campaspe Shire Council - Design and construction of Road upgrade of Two Tree Road, Carag Carag | To upgrade approximately 5km of Two Tree Road from an unsealed gravel road to an all weather sealed road, for heavy vehicle access and improve heavy vehicle productivity and safety. | $3,782,112 | $4,727,640 |
| VIC | City of Greater Geelong | City of Greater Geelong - Sandy Creek Road / Little River Ripley Road Heavy Vehicle Access Route Construction, Little River | The project will deliver upgrades to 2.4km of Sandy Creek Road (between Granite Road and Little River Ripley Road) and 1.2km of Little River Ripley Road (between Sandy Creek Road and Bacchus Marsh Road). The works will involve constructing a new sealed pavement with a width of 8.6 metres, designed to accommodate heavy vehicles with loads up to 140 tonnes. Additionally, one existing culvert and one bridge on Sandy Creek Road will be demolished and replaced with new structures engineered to support the expected increase in traffic loads. | $2,199,268 | $2,749,085 |
| VIC | Victoria, Department of Transport | Department of Transport and Planning (Vic) - Barr Creek Bridge Replacement, Cullen | The project will replace the existing Murray Valley Highway bridge over Barr Creek to allow for a safer and more efficient road network, enabling high productivity freight vehicles. | $3,890,000 | $7,780,000 |
| VIC | Hindmarsh Shire Council | Hindmarsh Shire Council - Construction of Dimboola Minyip Rd, Dimboola | To reconstruct and widen 1.4km of sealed road to include 2x lanes, 10m min. carriageway with 6.8m seal. | $364,000 | $455,000 |
| VIC | Northern Grampians Shire Council | Northern Grampians Shire Council - Landsborough Road Freight Safety and Productivity Project | The project will upgrade approximately 29 km of Landsborough Road to support 91-tonne 3-3-3 A-Doubles, increasing the allowable vehicle configuration from HML B-Doubles. The scope of works includes upgrading narrow culverts that are at risk of de-rating, widening substandard road seals, improving intersection geometry, installing linemarking, and constructing road safety barriers to enhance safety for freight vehicles and other road users. | $1,400,000 | $1,750,000 |
| VIC | Northern Grampians Shire Council | Northern Grampians Shire Council - Phillips Road Upgrade Project | This project will reconstruct and widen approximately 9.2 km of road to provide two 3.2 m lanes with sealed shoulders. Works include intersection upgrades at Danes Avenue, Rahleys Road, Krelle Road and Giles River Road to improve safety and allow heavy vehicle access, replacing or upgrading 16 culverts and strengthening the existing bridge with new guardrails. Roadside hazards will either be removed or protection barrier put in place to protect motorists | $2,860,000 | $3,580,000 |
| WA | City of Vincent | City of Vincent - Perth Inner City Safe Speed Zone Project | The project will reduce the posted speed limit on local access roads and local distributors in the urban residential neighbourhoods within the City of Perth, City of South Perth, City of Subiaco and the Town of Victoria Park, including portions of the City of Nedlands and Town of Cambridge through the installation of regulatory speed zone signage. | $968,500 | $1,938,500 |
| WA | Commissioner of Main Roads | Commissioner of Main Roads - Design and Construction of Heavy Vehicle Rest Area on Albany Ring Road - Menang Drive | The project will construct a HVRA with initial capacity of 20 Heavy Vehicle parking/decoupling bays, 10 light vehicle bay and 4 longer bays. The project will include amenities including toilets, showers, shade structure and BBQ area. | $3,083,080 | $6,166,160 |
| WA | Shire of Kellerberrin | Shire of Kellerberrin - Upgrade of Bruce Rock / Doodlakine Rd - SLK 2.95 to 4.10 | This project involves replacement of culverts, reconstruction of pavement, and widening and stabilisation works. | $1,310,720 | $1,638,400 |