• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2013 - Jun 2014
  • Estimated project cost $1,022,777
  • Australian Government contribution $622,777
  • Local Council/Shire Maranoa Regional Council
  • State QLD

Project description

The road in its current state has a very thin five (5) metre poorly formed gravel running surface. The drainage strutures along this section are inadequate and are unable to handle the overland stormwater run off during the summer months. This results in severe scouring and washouts along the road.

Rehabilitate, Widening and Seal Orallo Road to seven (7) metre bitumen seal from 16.50km to 19.50km (Goldsbrough). Install several new and widen existing drainage structures.

Total cost of proposed project is $1,022,777

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.