• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2013 - Dec 2013
  • Estimated project cost $408,300
  • Australian Government contribution $116,667
  • Local Council/Shire Shire of Broome
  • State WA

Project description

The existing roundabout has a badly deteriorated surface with cracking and numerous patches due to ground water entering the road structure from the grass area in the middle of the roundabout.It has an inadequate pavement depth.

Pavement strengthening using imported materials and/or stabilisation techniques,will prevent cracking and stop ground water entering the road structure.Replacing the grass landscaping with low water use plants will stop the daily flooding of the surface.

Total cost of proposed project is $408,300

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.