• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2011 - Mar 2014
  • Estimated project cost $384,847
  • Australian Government contribution $270,423
  • Local Council/Shire Griffith City Council
  • State NSW

Project description

This section of gravel road has a poorly formed gravel surface and poor drainage. The surface becomes slippery and potholed or corrugated depending on weather conditions and is dangerous to the travelling public. This road links the outer northern residential areas of Griffith to the Aerodrome, Golf Club and East Griffith.

Some land acquisition is required before Old Aerodrome Road is to be constructed and sealed to a width of 7.0m and a length 1.65km with associated drainage works. Construction is planned over a longer period to suit weather conditions and to achieve optimum quality of construction and sealing.

Total cost of proposed project is $384,847

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.