• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2012 - Sep 2014
  • Estimated project cost $1,850,000
  • Australian Government contribution $474,179
  • Local Council/Shire Shire of Chapman Valley
  • State WA

Project description

To correct and make better the poor vision sight distances and narrow section of road considered dangerous on curves and crests, rough gravel road surface needs to be sealed for the saftey of traffic users

Roadside clearing of vegetation, purchasing, widening and installation of culverts for drainage, pushing and screening of gravel in preparation for sealing, puchasing of signs and guide post for the road. Forming the road and sub base, gravel sheeting the road in preparation for a 7.0 metre wide seal from 0.00 straight line kilometre to 9.2 straight line kilometres

Total cost of proposed project is $1,850,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.