• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2013 - Feb 2014
  • Estimated project cost $190,308
  • Australian Government contribution $190,308
  • Local Council/Shire Loddon Shire Council
  • State VIC

Project description

The pavement in this section has deterioated significantly with a number of failures including pavement shoving, depressions and wheel tracking which hold significant amounts of surface water when it rains

It is proposed to mix and cement stabilise the existing pavement to a width of 6.2 meters then resheet with 100mm of Class 2 Fine Crushed Rock to a width of 9.2 meters which includes the road shoulder and then apply a 10mm primer seal over the 6.2 meter pavement

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.