• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2013 - Apr 2014
  • Estimated project cost $89,117
  • Australian Government contribution $89,117
  • Local Council/Shire West Wimmera Shire Council
  • State VIC

Project description

This is an urban road which is to be upgraded to a sealed road in line with the council plan of sealing urban roads. The road surface is rough and uneven with poor drainage.

The section of road will be constructed for a total length of 400m. The existing surface will have pavement material added to give an overall pavement width of 6m. The surface will be prepared and sealed with bitumen for a width of 5m A final wearing sealed surface will be applied in December 2013 on the road for a length of 400m and a width of 5m to protect the road formation from water, provide drainage and create a non skid surface

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.