• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2014 - Mar 2014
  • Estimated project cost $194,287
  • Australian Government contribution $194,287
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

The road is affected by delamination and disintegration of road surface and also with isolated failures. The road surface is very rough with unsatisfactory ride quality.

The proposed treatment include repair of failures, removal of the existing road surface and resurfacing of the road by placing new layer of asphalt. Length = 476 m; Width = 9.2 m; Area = 4379 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.