• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2013 - Nov 2013
  • Estimated project cost $175,000
  • Australian Government contribution $175,000
  • State VIC

Project description

The existing asphalt road surface is rutted and undulating with longitudinal and transverse cracking and has significant trench reinstatement patches.

Proposed to cold plane profile the existing road surface to a depth of 50 millimetres (full width)for a length of 370 metres and a width of 8 metres including to a depth of 100mm in the heavily rutted and undulating areas and resheet with 50mm size 14 base course asphalt and over the whole area with 50mm type H wearing course hot mix asphalt.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.