• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2014 - Mar 2014
  • Estimated project cost $172,399
  • Australian Government contribution $172,399
  • Local Council/Shire Melbourne City Council (City of Melbourne)
  • State VIC

Project description

The existing asphalt road surface is heavily rutted with substantial longitudinal and transverse cracking with fatigued appearance due to oxidation.

Proposed to cold plane profile the existing road surface to a depth of 50 millimetres for a length of 370 metres and a width of 13 metres and reinstate over the whole area with 10mm type H hot mix asphalt.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.