• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2013 - Jun 2014
  • Estimated project cost $296,550
  • Australian Government contribution $296,550
  • Local Council/Shire South Burnett Regional Council
  • State QLD

Project description

Wattlecamp Road is currently 3.6m wide road making it dangerous for overtaking or passing, that transitions to a two lane sealed pavement at each end. The road is a school bus route and has a high traffic volume. The cross drainage requires upgrading.

Shoulder widening - excavte and replace with suitable shoulder material. Provide an 8m formation with 300mm of pavement and 6.5m wide with a 2 coat seal. Upgrade the existing drainage crossing to 900mm diameter culverts.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.