• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2013 - Mar 2014
  • Estimated project cost $195,000
  • Australian Government contribution $195,000
  • Local Council/Shire Shire of Moora
  • State WA

Project description

Road is subject to heavy vehicle traffic and requires upgrading to carry increased traffic loads.The road is also used by the local school bus and due to the road geometry concern is raised about the safety of children due to the traffic mix. Road is slippery during winter and dusty during summer thus causing traffic hazards.

Upgrade existing surface from gravel to a sealed 7.0 mtere wide pavement with 1.5 metre wide gravel shoulders

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.