• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2013 - May 2014
  • Estimated project cost $209,930
  • Australian Government contribution $207,546
  • Local Council/Shire Shire of Trayning
  • State WA

Project description

Road surface failing/cracking, poor alignment and limited sight vision.

Reconstruct 2.7 km's which covers the 800 metre bend near Lamond Road and the 1900 metre of straight road either side between the recently reconstructed/widened sections (Jobs 11 and 12). Proposed road width will be 10.4 metres with an 8 metre seal (single coat) on curves and 7 metres on straights.

Total cost of proposed project is $209,930

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.