• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2013 - Sep 2013
  • Estimated project cost $146,670
  • Australian Government contribution $146,670
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

The road surface has been affected by potholes, cracks and pavement failures. The surface asphalt is old and brittle. There are a number of repair patches, which makes this road rough and uncomfortable to drive.

The proposed treatment includes replacement of failed pavement areas with asphalt and resurfacing of the whole road section with asphalt. Length = 251 m; Width = 12 m; Area = 3012 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.