• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2014 - Jun 2014
  • Estimated project cost $324,273
  • Australian Government contribution $309,061
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

The road section has been affected by potholes and numerous pavement failures and repair patches. It is very rough to drive on. The existing surface is old and brittle and prone to cracking. Some kerb and gutter sections are damaged and displaced.

The proposed treatment includes replacement of damaged kerb and gutter sections, replacement of existing sub standard pavement materials with asphalt and resurfacing of the road section with asphalt. length = 244 m; Width = 12 m; Area = 2928 m2.

Total cost of proposed project is $324,273

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.