• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2013 - Dec 2013
  • Estimated project cost $163,110
  • Australian Government contribution $163,110
  • Local Council/Shire Bass Coast Shire Council
  • State VIC

Project description

Narrow pavement 6.1 metres wide with deep open drain close to edge of pavement, high vehicle movement and heavy cartage. Requires widening to link road standard.

Design construct kerb to control existing open drain, widen pavement and asphalt surface to minimum 7.0 metre traffic lanes.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.