• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2014 - May 2014
  • Estimated project cost $157,400
  • Australian Government contribution $60,017
  • Local Council/Shire City of Subiaco
  • State WA

Project description

Longitudinal/Reflective Cracking including depressions in the pavement. Localised pavement fatigue failure due to ageing of the Pavement.

Profiling the cracked pavement by 20-25mm thickness and resurfacing with Dense Graded Asphalt in the Traffic lanes and resurfacing with Red coloured Asphalt in the parking lanes. Total length of Road-350 metres, Average width of pavement- 9.5 metres, Average area of pavement-3325 m2

Total cost of proposed project is $157,400

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.