• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2013 - Feb 2014
  • Estimated project cost $209,748
  • Australian Government contribution $209,748
  • Local Council/Shire Shire of Murray
  • State WA

Project description

The current road seal is 3.7 metres in width with significant pavement and edge failures, an ongoing reconstruction program is being undertaken to improve the road standard and upgrade the access from the Coolup area toward the west to Old Bunbury Road which links in with the Forrest Highway.

Apply second coat seal to previously constructed sections for a length of 2.3 kilometres. Reconstruct, widen and install associated drainage for the last 500 metres to a minimum road width of 6.0 metres. These works will be ongoing until Fishermans Road is completed between the Coolup area and Old Bunbury Road.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.