• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2013 - Jan 2014
  • Estimated project cost $165,000
  • Australian Government contribution $165,000
  • Local Council/Shire City of Mount Gambier
  • State SA

Project description

The road pavement has failed and cracked in the east bound and west bound traffic lanes. The drainage for the road is satisfactory and will not be altered.

The proposal is to remove the cracked areas of road pavement to a predetermined design depth and replace with assphalt. Commercial Street East carries very high traffic volumes (it is the highest trafficked road in the City) and it imperative that the works are carried out quickly and with minimum delays. The new aspalt will strenghten the road pavement and also provide a long lasting and smooth surface for traffic.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.