• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2013 - Apr 2014
  • Estimated project cost $133,201
  • Australian Government contribution $133,201
  • Local Council/Shire Shire of West Arthur
  • State WA

Project description

Road is currently an average of 6 metres wide of sandy formation with sections of gravel, a section of heavy vegetation on both side of road, with poor alignment and drainage.

Starting from Hillman Road, Straight Line Kilometres 5.33 to Straight Line Kilometres 6.11 then Straight Line Kilometres 19.5 to Straight Line Kilometres 21.25 then Straight Line Kilometres 21.97 through to Straight Line Kilometres 23.05. Clear the section of heavy vegetation to 14m wide on a conforming alignment, cut drains, box out and gravel sheet to 150mm thick and 9 metres wide formation. Extend culvert where required, rebuild headwalls and guide post as required.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.