• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2014 - Mar 2014
  • Estimated project cost $56,273
  • Australian Government contribution $56,273
  • Local Council/Shire City of Armadale
  • State WA

Project description

Existing road is 7m wide with an asphalt wearing course. It is over 20 years old. The existing kerb is badly damaged along both sides and the asphalt surface is cracked over a considerable length.

Proposal is to crack seal, resurace with 30mm thick stone mastic asphalt to the full width of 7m. All of the existing kerb along both sides is also to be replaced.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.