• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2014 - Jun 2014
  • Estimated project cost $600,000
  • Australian Government contribution $262,697
  • Local Council/Shire Rockhampton Regional Council
  • State QLD

Project description

A level 3 inspection of the bridge has identified a number of major defects.The most economical way to rectify the defects is to replace the bridge with box culverts

Replace the existing timber bridge with reinforced concrete box culverts to match the waterway of the existing bridge and realign road approaches to the new culvert to match up to new structue at similar levels to the existing structure.

Total cost of proposed project is $600,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.