• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2013 - Oct 2013
  • Estimated project cost $93,333
  • Australian Government contribution $93,333
  • Local Council/Shire Clarence Valley Council
  • State NSW

Project description

The road surface has failed in sections within this length, resulting in significant deformation of the road surface.

The proposed work involves the rehabilitation of 700 metres of pavement within this length. The failed sections of pavement will be removed and replaced with base grade gravel. The sections will then be overlaid with up to 150 mm of gravel and sealed. The rehabilitated length of road will be 700 metres long and 4.0 metres wide.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.