• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2013 - Dec 2014
  • Estimated project cost $424,410
  • Australian Government contribution $400,941
  • Local Council/Shire Mount Alexander Shire Council
  • State VIC

Project description

Unsealed road surface to be sealed to eliminate drainage issues

Realignment and sealing of existing pavement, underground drainage network with surface kerb and channel.Single lane drive over kerb and 5 metre wide seal with associated drainage works.Design alteration to include kerb and channel

Total cost of proposed project is $424,410

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.