• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2013 - Jul 2014
  • Estimated project cost $1,110,591
  • Australian Government contribution $1,110,591
  • State SA

Project description

The floodways to be upgraded scour heavily after moderate flows and cause road closures. There are also significant maintenance costs associated with the re-instatement of these floodways.

The work will consist of excavating existing material and replacing with crushed rock, this will then be stabilised with cement and concrete toewalls will be constructed to prevent under-mining. The floodways vary in length from 100 to 200 metres and will be 10 metres in width.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.