• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2013 - Mar 2014
  • Estimated project cost $507,783
  • Australian Government contribution $296,766
  • Local Council/Shire Brimbank City Council
  • State VIC

Project description

The existing road pavement exhibits oxidation and areas of significant longitudinal and crocodile cracking, loss of aggregate and patching. In addition the concrete kerbing and footpath is in a poor condition.

Rehabilitation of 323 metres of existing pavement and resurfacing with asphalt, reconstruction of existing kerb and channel, reconstruction of existing vehicle crossings, where required, reconstruction of damaged footpath and the construction of 342 metres of underground drainage works.

Total cost of proposed project is $507,783

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.