• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2013 - Feb 2014
  • Estimated project cost $1,035,266
  • Australian Government contribution $885,266
  • Local Council/Shire Winton Shire Council
  • State QLD

Project description

Significant damage is sustained to the road at multiple locations in this section during rainfall events due to creeks that intersect with the road. The road surface suffers from considerable scouring and loss of compacted surface gravel as well as the dropping of silt when the creeks run, causing them to become impassable.

Construction of concrete floodways to make the creek crossings passable to all traffic during rainfall events and alleviate damage to the road. The concrete floodways will all be 7 metres wide but of varying lengths.

Total cost of proposed project is $1,035,266

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.