• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2013 - May 2014
  • Estimated project cost $160,693
  • Australian Government contribution $160,693
  • Local Council/Shire Shire of Mt Marshall
  • State WA

Project description

The entire 3.50 kilometre length has an old 3.8 metre wide seal that is starting to crack and pothole requiring an increased amount of maintenance. Some parts of the road have been widened to 7.2 metres and these parts have not yet received their second seal and have been damaged by Heavy Access Vehicles that use this road.

The entire section is to be resealed with the smaller 3.8 metre wide sections remaining at 3.8 metres wide and the larger 7.2 metre wide sections remaining at 7.2 metres.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.